Southeast Business Park Stage 2 Geotechnical Assessment
August 23, 2021

Balpara was engaged to perform a geotechnical assessment and soil testing for Stage 2 of the Southeast Business Park site in Pakenham. 


Project Overview


As part of the Business Park’s Stage 2 development, Balpara provided a geotechnical assessment report and facilitated soil testing to determine the suitability of future works at this industrial and commercial development. 

 

The geotechnical assessment involved the drilling of six horizontal boreholes, which were drilled at approximate locations along Henty Street, which runs parallel to the rail tracks. Soil samples were collected from each of the boreholes for geotechnical classification. Findings were prepared in a detailed report along with recommendations regarding bearing, soil strength and founding depths for the proposed works. 


Project Scope

 

  • Project managing the extraction of soil samples from each borehole for laboratory testing to determine soil classification and profiling. 
  • Classification of the site based on site investigation, geology and topography of the area. 
  • Preparation of geotechnical report containing recommendations regarding appropriate founding depths, excavatability, side support and suitable vertical bearing pressure for the proposed works at the industrial and commercial development. 
  • Preparation of material parametres based on results from laboratory soil testing. 
  • Proposing parametres regarding retaining structures based on the soil classification that was identified on site.


Value Add

 

Balpara provided a streamlined service for the client, coordinating soil testing alongside geotechnical services. 

 

Relevant Accreditation/Quality Standards

 

All testing and observations were performed according to the provision of AS1726 – 2017 (Geotechnical Site Investigations). 


Similar Projects

 

You may also like

July 21, 2026
The story of how Balpara transitioned from a drafting business into a specialist engineering and technical provider can be traced to eight key projects.
New sidewalk and road beside a grassy hillside under a clear blue sky
July 8, 2026
Balpara was engaged by the developer to deliver the complete suite of AusNet Underground Reticulation (URD) services for the Herberts Lane North residential subdivision in Diamond Creek, Victoria.
Road construction with orange barriers, blue fencing, and traffic cones near a city street under cloudy sky
July 3, 2026
Balpara was engaged by the developer and United Energy to deliver contestable public-lighting works along Burwood Highway including project management, auditing, and detailing.