Projects

highway in melbourne
June 30, 2025
Balpara was contracted to carry out detailing and auditing services for the Lathams Road Upgrades in Carrum Downs, as part of Victoria’s Big Build. Project Overview This project involved multiple upgrades across a 2.5km section of Lathams Road. The upgrade included the addition of additional lanes going both ways, upgrading 13 intersections along the road, building a new bridge over the Peninsula Link, adding walking and cycling paths, widening existing roundabouts, and installing safety barriers. The project had a strong emphasis on community consideration and utilising sustainable project materials. As an example, drainage pipes and kerbs installed used recycled plastic and a social procurement strategy was formulated by the developer, Winslow, to actively engage Indigenous businesses, generating meaningful employment and promoting indigenous representation in the construction industry. These upgrades were completed with the intention of improving traffic flow and travel times, enhancing safety for pedestrians and cyclists and boosting the connectivity of local businesses in the Carrum Downs and Seaford community. Lathams Road is a vital road link for many of those in the surrounding community, and as such, these upgrades substantially improve traffic flow and access to surrounding industrial areas. Scope The team at Balpara was engaged to carry out detailing and auditing services for this road upgrade, including detailing, drafting and auditing. Detailing of the assets according to United Energy Standards: Public lighting poles Back of kerbs, both existing and new Conduits Finish surface levels Boundary lines Fences Other services in trench, i.e. storm water, comms, gas and more Drafting as-builts Auditing: Conduit installation to design Checking depths / offsets of conduits for compliance Maintaining compliant separation to other assets in the ground Checking backfills and warning tape compliance Checking cables sizes and type being installed Checking connections inside poles and pits Checking correct poles and lanterns, and pole numbers are being installed Producing audit reports for clients Value Add Balpara specialises in detailing and auditing and have a large team dedicated to all utilities across Victoria. With decades of experience in competitive bidding, Balpara delivers precise as-built drawings and audit reports, in accordance with United Energy and VESI Standards. Relevant Accreditation/Quality Standards Lighting along Lathams Road designed to AS/NZS 1158 – Category V3 requirements All assets installed in accordance with United Energy’s Standards and requirements VESI Standards VEDN Accredited Similar Projects Wells Road & Bardia Avenue Upgrades – Detailing & Auditing O’Shannasay Reservoir Melbourne Water Upgrade VEDN Civil, Electrical, Cable Hauling & Network Auditing Wyndham City Tarneit Road Public Lighting Project
June 16, 2025
Balpara was engaged by Civil & Road Contractor to provide detailing and auditing services for the signalisation upgrade of Wells Road and Bardia Avenue in Frankston. Project Overview This upgrade was identified as necessary by Frankston City Council to provide a safer and more accessible parking facility and road upgrades along Wells Rd and Bardia Avenue, to support active transport, reduce congestion, and improve overall safety for the growing Frankston City community. Road upgrades included the resurfacing of pavement, installation of new asphalt, upgrade of kerbing and drainage systems, re-painting line markings, and upgrading street lighting and traffic signal infrastructure.  With construction completed in May 2025, the Frankston City community can now benefit from the enhanced traffic flow, improved lighting, safer roads and more accessible parking. Scope The team at Balpara provided detailing, drafting and auditing services for assets installed as part of the new road upgrades. Works included: Utilising GPS technology to accurately capture the locations of new underground assets to develop a comprehensive layout of asset locations. Producing precise as built plans in accordance with current UE standards. Auditing public lighting poles, conduit installations and electrical pit installations. An on-site electrical walkthrough on to prepare the pre-commissioning audit report for clients. Value Add Balpara holds accreditations with all Victorian Power Authorities and as such was able to accurately detail, draft and audit this project to UE and council standards, producing deliverables within the required timeframes and allowing for efficient and quality workmanship for the benefit of the Frankston City community. Relevant Accreditation/Quality Standards UE Standards VESI Standards VEDN Accredited Similar Projects Major Roads Projects Victoria Kerang Solar Plant Oshannasay Reservoir Upgrade Ausnet Network Audits
a pump track
May 9, 2025
La Trobe City Council are planning to construct a Pump Track for residents to enjoy. This community space is designed to increase community connection in a positive environment.
March 28, 2025
Balpara was engaged by civil contractor to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.
Glen Waverley Substation
February 24, 2025
Balpara was engaged by United Energy to carry out feature surveying, incorporating ground penetrating radar surveys for the Glen Waverley Zone Substation.
a large energy hub with a power unit in the background
November 25, 2024
This project is a much-needed solution to the energy crisis in Australia and paves the way for future, innovative renewable energy projects. Balpara’s involvement aligns with our commitment to engineer a sustainable future for generations to come.
Image showing major road network.
November 25, 2024
Balpara has been engaged to deliver a variety of services across multiple aspects of the Major Roads Projects Victoria (MRPV) roll out. Project Overview Major Road Projects Victoria is the organisation behind the North East Link , West Gate Tunnel , and Big Build Roads delivering dozens of essential freeway and road upgrades across the State. It is an ambitious project for Victoria that has been in progress for many years. MRPV’s commitment is to reduce traffic congestion in a State with a growing population, while making the roads that Victorians rely on every day safer for all users. Beyond the impact on Victoria’s transport network, MRPV is working to leave a legacy that benefits communities and provides sustainable employment and supply chain opportunities for some of Victoria’s most disadvantaged groups. Scope These projects are still underway and Balpara continues to work through the various project deliverables across our full suite of services. To date, we have provided the following services across multiple projects and stages: Public lighting design and Lux Level assessment AS3000 design Electrical asset relocation Electrical and communications design Overhead pole surveying and design Asset and feature surveying Detailing and auditing Soil testing and geotechnical services Cable tracing and GPR locating Engineering design and project management (including PM2 recognised services) Value Add Balpara’s specialised and unique experience in the Victorian electrical sector enables the delivery of a broad range of services . These services have been delivered to various components of all programmed major roads works as part of the MRPV. We’ve become the first choice for many providers due to our speciality expertise, extensive knowledge and proven experience, reliability and credibility. Accreditations Balpara has all relevant accreditation and certifications required. We currently work with Victorian Utilities, Authorities and Councils, are VEDN approved VicRoads accredited. Our people are VESI accredited Balpara is also and have a credible history with clients across Victoria.
September 5, 2024
Balpara was engaged by Latrobe City Council to undertake surveying and design services for path lighting at Burrage Reserve, Newborough.
Street lights similar to Fawker St
April 18, 2024
Balpara was engaged by Hume City Council as part of a streetscape upgrade on Fawkner Street, incorporating safety lighting assessment and design at stage 1.
Show more