SCOPE OF THE PROJECT
Electrical Infrastructure Design
Once the Overall Estate Electrical Design was completed, a plan showing the full extent of conduit, electrical cabling, lighting and substations for each Estate Stage was delivered.
This Preliminary Plan was the basis from which electrical construction tenders could be sought.
The Preliminary Plan was drafted and a copy was forwarded to the client for feedback as well as to the local Municipality and VicRoads for lighting location approval. The Plan was then submitted to the Utility for approval.
Once approved by the Utility, an electronic copy of the plan was forwarded to the client as the final design.