Wells Road & Bardia Avenue Upgrades – Detailing & Auditing
June 16, 2025

Balpara was engaged by Civil & Road Contractor to provide detailing and auditing services for the signalisation upgrade of Wells Road and Bardia Avenue in Frankston. 

 

Project Overview


This upgrade was identified as necessary by Frankston City Council to provide a safer and more accessible parking facility and road upgrades along Wells Rd and Bardia Avenue, to support active transport, reduce congestion, and improve overall safety for the growing Frankston City community. 

Road upgrades included the resurfacing of pavement, installation of new asphalt, upgrade of kerbing and drainage systems, re-painting line markings, and upgrading street lighting and traffic signal infrastructure. 



With construction completed in May 2025, the Frankston City community can now benefit from the enhanced traffic flow, improved lighting, safer roads and more accessible parking. 


Scope


The team at Balpara provided detailing, drafting and auditing services for assets installed as part of the new road upgrades. 

 

Works included: 

 

  • Utilising GPS technology to accurately capture the locations of new underground assets to develop a comprehensive layout of asset locations. 
  • Producing precise as built plans in accordance with current UE standards. 
  • Auditing public lighting poles, conduit installations and electrical pit installations. 
  • An on-site electrical walkthrough on to prepare the pre-commissioning audit report for clients. 


Value Add


Balpara holds accreditations with all Victorian Power Authorities and as such was able to accurately detail, draft and audit this project to UE and council standards, producing deliverables within the required timeframes and allowing for efficient and quality workmanship for the benefit of the Frankston City community.


Relevant Accreditation/Quality Standards

UE Standards 

VESI Standards 

VEDN Accredited 


Similar Projects

Major Roads Projects Victoria

Kerang Solar Plant

Oshannasay Reservoir Upgrade

Ausnet Network Audits



You may also like

July 21, 2026
The story of how Balpara transitioned from a drafting business into a specialist engineering and technical provider can be traced to eight key projects.
New sidewalk and road beside a grassy hillside under a clear blue sky
July 8, 2026
Balpara was engaged by the developer to deliver the complete suite of AusNet Underground Reticulation (URD) services for the Herberts Lane North residential subdivision in Diamond Creek, Victoria.
Road construction with orange barriers, blue fencing, and traffic cones near a city street under cloudy sky
July 3, 2026
Balpara was engaged by the developer and United Energy to deliver contestable public-lighting works along Burwood Highway including project management, auditing, and detailing.