Wells Road & Bardia Avenue Upgrades – Detailing & Auditing
June 16, 2025

Balpara was engaged by Civil & Road Contractor, Healey Infrastructure, to provide detailing and auditing services for the signalisation upgrade of Wells Road and Bardia Avenue in Frankston. 

 

Project Overview


This upgrade was identified as necessary by Frankston City Council to: provide a safer and more accessible parking facility and road upgrades along Wells Rd and Bardia Avenue; to support active transport; reduce congestion; and improve overall safety for the growing Frankston City community. 

Road upgrades included the resurfacing of pavement, installation of new asphalt, upgrade of kerbing and drainage systems, re-painting line markings, and upgrading street lighting and traffic signal infrastructure. 

With construction completed in May 2025, the Frankston City community can now benefit from the enhanced traffic flow, improved lighting, safer roads and more accessible parking. 


Scope


The team at Balpara provided detailing, drafting and auditing services for assets installed as part of the new road upgrades. 

 

Works included: 

 

  • Utilising GPS technology to accurately capture the locations of new underground assets to develop a comprehensive layout of asset locations. 
  • Producing precise as built plans in accordance with current UE standards. 
  • Auditing public lighting poles, conduit installations and electrical pit installations. 
  • An on-site electrical walkthrough on to prepare the pre-commissioning audit report for clients. 


Value Add


Balpara holds accreditations with all Victorian Power Authorities and as such was able to accurately detail, draft and audit this project to UE and council standards, producing deliverables within the required timeframes and allowing for efficient and quality workmanship for the benefit of the Frankston City community.


Relevant Accreditation/Quality Standards

UE Standards 

VESI Standards 

VEDN Accredited 



Similar Projects

Major Roads Projects Victoria

Kerang Solar Plant

Oshannasay Reservoir Upgrade

Ausnet Network Audits



You may also like

a pump track
May 9, 2025
La Trobe City Council are planning to construct a Pump Track for residents to enjoy. This community space is designed to increase community connection in a positive environment.
March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balpara’s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercor’s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards
technician looking at a substation
March 19, 2025
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.