Burrage Reserve Path Lighting
September 5, 2024

Balpara was engaged by Latrobe City Council to undertake surveying and design services for path lighting at Burrage Reserve, Newborough.


Project Overview

 

The work for this project was conducted at the Burrage Reserve in Newborough, on the West side of the reserve between Southwell Avenue and John Field Drive.


Balpara completed a turnkey solution for a variety of services including Soil Testing Reports, Geotechnical Investigations, Traffic Management, Feature Survey, GPR Service Locating and Engineering Design for the proposed path lighting works. Our unique ability to fulfill the diverse scope of services offered a synchronised and smooth end to end project delivery. 

During the design phase Balpara liaised with the relevant authorities to ensure we were working with all relevant material. 


Scope of Work


The full scope of services that were engaged included:


  • Geotechnical Pavement Investigation and Design: carried out to determine a suitable design. Traffic management engaged while works were completed.


  • Feature Survey Works: all features were located to enable the design of the path lighting, including locating and proving the depth of existing utility services. Feature surveying was conducted to ensure the design prioritised the location of lights at the intersection of pathways, defined access points and playground areas.


  • Service Location: the location of services within the extent of works for the site were identified. This involved locating and proving the depth of existing utility services, including electricity, gas, water, telecommunications cable including NBN services, and sewer.


  • Vegetation Removal: recommendations for any required vegetation removal across the sites were provided. A surface survey was also conducted to locate pathways, trees and vegetation, drainage, street signs and more.


  • Design Works: Engineering design was provided for the proposed path lighting works. The design included minimum PP3 category lighting scheme, cable layout with column location plans produced using AutoCAD, required Certificates of Electrical Safety (CES) detailed in the specification, MGA coordinates for each pole provided as well as any reference marks used in the survey. Technical specifications for the construction of the lighting project were also provided, including the updating of Plans to โ€œas constructedโ€ to comply with AS3000 and โ€œPrivate Mains on Public Landsโ€ (PMPL) to allow connection to the utility grid. Existing street lighting was considered as part of the design to reach the PP3 category lighting standard.


  • Bill of Quantities and Engineering Estimate: a bill of quantities and engineering estimate for the proposed path lighting works were provided.


Value Add


Balpara diverse service offerings allowed us to provide end-to-end project deliverables due, which reduced project timelines. Our finished design ensured the utilisation of underground power cables and focused on reducing the impact to existing parklands and minimising risk to the public. Balparaโ€™s experience with the relevant standards and requirements ensured a more streamlined approach.


Similar Projects


You may also like

June 16, 2025
Balpara was engaged by Civil & Road Contractor, Healey Infrastructure, to provide detailing and auditing services for the signalisation upgrade of Wells Road and Bardia Avenue in Frankston. Project Overview This upgrade was identified as necessary by Frankston City Council to: provide a safer and more accessible parking facility and road upgrades along Wells Rd and Bardia Avenue; to support active transport; reduce congestion; and improve overall safety for the growing Frankston City community. Road upgrades included the resurfacing of pavement, installation of new asphalt, upgrade of kerbing and drainage systems, re-painting line markings, and upgrading street lighting and traffic signal infrastructure. With construction completed in May 2025, the Frankston City community can now benefit from the enhanced traffic flow, improved lighting, safer roads and more accessible parking. Scope The team at Balpara provided detailing, drafting and auditing services for assets installed as part of the new road upgrades. Works included: Utilising GPS technology to accurately capture the locations of new underground assets to develop a comprehensive layout of asset locations. Producing precise as built plans in accordance with current UE standards. Auditing public lighting poles, conduit installations and electrical pit installations. An on-site electrical walkthrough on to prepare the pre-commissioning audit report for clients. Value Add Balpara holds accreditations with all Victorian Power Authorities and as such was able to accurately detail, draft and audit this project to UE and council standards, producing deliverables within the required timeframes and allowing for efficient and quality workmanship for the benefit of the Frankston City community. Relevant Accreditation/Quality Standards UE Standards VESI Standards VEDN Accredited ๏ปฟ Similar Projects Major Roads Projects Victoria Kerang Solar Plant Oshannasay Reservoir Upgrade Ausnet Network Audits
a pump track
May 9, 2025
La Trobe City Council are planning to construct a Pump Track for residents to enjoy. This community space is designed to increase community connection in a positive environment.
March 28, 2025
Balpara was engaged by civil constructor, Directbor, to provide detailing and drafting services to connect the Kerang Solar Plant to the nearby Kerang Terminal Station. Project Overview The Kerang Solar Plant in Victoria is a BSR Energy project, which aims to generate enough clean and reliable energy to offset the annual consumption of approximately 16,000 homes, contributing to a more sustainable future while reducing reliance on traditional power sources. Construction commenced in March 2024, and is projected to save 66,380 tonnes of CO2-equivalent emissions annually. The land parcel is over 64 hectares in size, with the plan to visually integrate into the surrounding agricultural landscape with extensive planting of native flora around the entire project perimeter. The bell-mouth intersection off Lodden Valley Highway will be upgraded for improved accessibility and safety as part of this project. Scope Balparaโ€™s involvement in the project was undertaken over the course of a month starting in August 2024, with Directbor engaging the team on behalf of Powercor. The Balpara team completed detailing and drafting of assets connecting the new Kerang Solar Plant to Powercorโ€™s distribution network. Balpara employed GPS technology to accurately capture underground asset locations and create a comprehensive plan of assets within the short timeframe required. The project scope included: Capturing new underground asset locations to required standard using GPS equipment. Creating as-built plans of relevant assets to current Powercor standards. Providing captured 3D data to Powercor for future asset relocations. Value Add Balpara provided timely and accurate drawings and was able to quickly meet the needs of client variations. The Balpara team is well versed in working with all utility standards, including Powercor, which helped to streamline the project. Accreditations Powercor Standards