Balpara was engaged to conduct a lighting assessment on Ballan Road, and design temporary solar lighting for the road and pedestrian pathway during an upgrade project.
Balpara undertook electrical design for a 12-lot residential subdivision at a Station Street residential development, complying with AS/NZS 3000 standards and NBN infrastructure requirements.
As we reach this significant milestone, Balpara’s Founders and CEO reflect on our journey, and how we’ve evolved with the needs of Australian communities.
Balpara was engaged to deliver public-lighting works along Koo Wee Rup Road in Healesville, including project management (PMC), auditing, and detailing services.
Balpara was employed to deliver electrical and NBN designs as well as project management services for both stages of a new Estate in Leopold, 10km east of Geelong.
La Trobe City Council are planning to construct a Pump Track for residents to enjoy. This community space is designed to increase community connection in a positive environment.
Balpara was engaged by Powercor to conduct a turnkey solution at the Echuca Zone Substation. This included Project Management of Feature Surveying, Geotechnical Services and Contaminated Soil Testing.